- Milwaukee, Wisconsin
Zablocki VA Medical Center AHU Replacement
When the Zablocki VA Medical Center was faced with replacing a 50+ year old, 110,00cfm air handling unit that served most of the upper floors of the hospital they looked to IBC Engineering to prepare design documents for this major upgrade. Work included modifying adjacent ducting, dampers, humidifier, filters, pre-heat, heating & cooling coils, and installing DDC controls for the new unit.
$3.3 million
- HVAC Design
- Electrical Design
- Lighting Design
- Plumbing Design
- Fire Protection Scope Design