General Mitchell International Airport Boiler

Project Overview

General Mitchell International Airport retained IBC Engineering for the design of the replacement of Boiler #3 in the Power Plant that serves the airport. The Boiler #3 replacement project was the final phase of a multi-phase project to replace the original boilers in the Power Plant that was constructed in 2000.

Project Details

Project Cost:

$640,000

IBC Contributions

  • Electrical Design
  • HVAC Design