General Mitchell International Airport retained IBC Engineering for the design of the replacement of Boiler #3 in the Power Plant that serves the airport. The Boiler #3 replacement project was the final phase of a multi-phase project to replace the original boilers in the Power Plant that was constructed in 2000.
Project Details
Project Cost:
$640,000
IBC Contributions
- Electrical Design
- HVAC Design