General Mitchell International Airport Boiler

General Mitchell International Airport retained IBC Engineering for the design of the replacement of Boiler #3 in the Power Plant that serves the airport. The Boiler #3 replacement project was the final phase of a multi-phase project to replace the original boilers in the Power Plant that was constructed in 2000.

$640,000
  • Electrical Design
  • HVAC Design